Home › Forums › General › Quest for 275 plus MPH › Reply To: Quest for 275 plus MPH
Rear hatch area is completely done, all hoses connected, wiring completed, everything bolted in place etc. All fluids were put in earlier this week to include about 7 gals of oil, might be some expensive oil changes in the future. The gas pedal has a toe lift installed, some tech inspections do look for that if you have throttle cables vs fly by wire. We are very close to starting up Dr Frankenstein’s monster and getting it on the dyno. I’m so ready for this moment.